The plumbing has begun. Drains are set up to leave the house through the basement. We have fresh milled timbers and the heat piping is set up in the basement. The heat will run through the floor. Soon concrete will be poured on top. So much is happening that I have heard about, but I have never seen in process. Tilt is orchastrating all of the components with grace. I have been slack to report here because there is no big drama to see, but very important things are happening. Most of the beams were delivered, we are still waiting on the gerts and top plates (they are longer lengths and will be sawn elsewhere). Tilt is starting to spend his days at the site, setting up, making order lists, and cleaning up the shack (the beat up building that will be my clay studio). Oh, and mowing lawn to rest his brain!
Thursday, June 10, 2010
Plumbed Timber Heat
The plumbing has begun. Drains are set up to leave the house through the basement. We have fresh milled timbers and the heat piping is set up in the basement. The heat will run through the floor. Soon concrete will be poured on top. So much is happening that I have heard about, but I have never seen in process. Tilt is orchastrating all of the components with grace. I have been slack to report here because there is no big drama to see, but very important things are happening. Most of the beams were delivered, we are still waiting on the gerts and top plates (they are longer lengths and will be sawn elsewhere). Tilt is starting to spend his days at the site, setting up, making order lists, and cleaning up the shack (the beat up building that will be my clay studio). Oh, and mowing lawn to rest his brain!
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment